Homebase – Multi-site LED Lighting Upgrade

Energy & Technical Services was appointed by Homebase to project manage Phase 1 of the LED lighting upgrade for 79 stores across the UK and Ireland. The stores selected were identified as ‘Priority 1’ – sites with lighting failures.

The inefficient and aging F-Gas screw packs and associated condensers were replaced with new scroll pack internal units with external air-cooled condensers, F&R pipework and controls.

Challenge

Shortly after the project commenced, the programme of works was escalated to ensure all stores were completed within 3 months instead of 5.

Early stakeholder engagement was essential to ensuring works were completed on time without impacting on trade. Working collaboratively with client representatives, Contractors, Suppliers and Store Managers allowed us to work flexibly to meet project critical deadlines.

Added Value / Achievements

Our team of Data Analysts worked with the wider team to ensure the project deliverables were met. Collating energy data and monitoring performance at the various stages of the project lifecycle, our Technical Energy Centre calculated and identified energy savings delivered against each store which were presented to the client. Additional cost control measures ensured the project remained within budget and achieved a cost reduction of £0.5m.

 LED lighting upgrade for 79 stores across the UK and Ireland

cost reduction of £0.5m

related CASE STUDIES

Harris Lamb – Mechanical & Electrical Performance Specification

Successful office fit-out project with upgraded VRF heat pump cooling, LED lighting and heat recovery ventilation. Improved energy efficiency and occupant comfort led to an increase in the Energy Performance Certificate (EPC) rating from C to B.

Midcounties Co-Operative – ESOS Phase 3 Compliance

Midcounties Co-operative achieved their ESOS Phase 3 compliance successfully with a total of 346,650kWh opportunities identified and resulting in 71,896 Kg of emissions to be saved.

Woodie’s – Decarbonisation & Energy Performance Audit

Our proposed photovoltaic solution can enable the production of circa 70,000kWh of electricity annually. There is also a suggested destratification system, achieving savings of up to 20% in heating costs.