Savills – Performance Auditing

Client: Savills

Value: £52,000

Duration: 3 years

Role: Technical Consultancy; Energy Management; Performance Auditing

System / Service: M&E Services; HVAC Plant and Equipment; Conformance; BMS & Controls

Project Scope

At the time of appointment, The Cube comprised a large, new build, multi-use site located in the centre of Birmingham comprising Restaurants, a Hotel, Residential, Offices, Retail, Spa & Leisure Facilities and an underground Car Park.

ETS was initially appointed by Savills to survey the HVAC system and complete an energy audit with a view to establishing a method of monitoring and measuring energy consumption throughout the building.

The initial survey included possible energy savings initiatives, a full asset list, plant performance, planned preventative maintenance (PPM) review, and an assessment of energy / building compliance. ETS were then employed to act as the Energy Managers to complete quarterly energy audits over a three-year period.

Key Challenges

The building comprises a total floor space of c.450,000 sqft, with multi-use tenancies, which all have different energy requirements. Careful consideration was required for any energy saving initiatives proposed. Solutions needed to remain low cost and also reflect the energy consumption requirements for the various tenancies within this complex multi-use site.

Added Value / Achievements

During the first three months, ETS achieved a pro-rata £25,000 per annum savings through making operational changes to the plant equipment. ETS also helped the client improve operational behaviour, and managed / maintained operational and energy efficiency whilst the building became more densely populated with new tenants.