BNP Paribas Real Estate – Chiller Replacement

The existing chillers at Princes Exchange in Leeds were operating at less than 50% capacity and nearing the end of life, impacting the comfort conditions within the building.

We were instrumental in the design, specification, tendering and project management for new 2 air-cooled chillers that were both larger in cooling capacity and more energy efficient.

Challenge

Energy & Technical Services was able to source new chillers which provided the required increased cooling capacity and were small enough to be installed in the confined location of the existing equipment. To minimise the disruption caused by necessary road closures, works were completed on the weekend at midnight, within a 6-hour time frame.

Added Value / Achievements

Since installation, comfort conditions have been restored throughout the building. The new chillers are not only operationally superior but also have an added benefit of being more energy efficient, providing further savings for the client.

HVAC review and upgrade support

ensured energy efficiency and tenant comfort

related CASE STUDIES

Harris Lamb – Mechanical & Electrical Performance Specification

Successful office fit-out project with upgraded VRF heat pump cooling, LED lighting and heat recovery ventilation. Improved energy efficiency and occupant comfort led to an increase in the Energy Performance Certificate (EPC) rating from C to B.

Midcounties Co-Operative – ESOS Phase 3 Compliance

Midcounties Co-operative achieved their ESOS Phase 3 compliance successfully with a total of 346,650kWh opportunities identified and resulting in 71,896 Kg of emissions to be saved.

Woodie’s – Decarbonisation & Energy Performance Audit

Our proposed photovoltaic solution can enable the production of circa 70,000kWh of electricity annually. There is also a suggested destratification system, achieving savings of up to 20% in heating costs.