THIS ARTICLE AT A GLANCE

CONTACT ETS

If you have any questions or would like to discuss further what you should be doing, ETS is here and willing to help.
Call 0117 205 0542
Email enquiries@energy-ts.com
Submit a contact form

CHECK OUR SERVICES

ALDI – Solar PV project management

Energy & Technical Services was appointed to project manage Phases 9 – 13 of ALDI’s Solar PV roll-out, assisting ALDI with tendering, evaluation, engagement with contractors and project management across 200+ stores in the UK and Ireland.

Challenge

Feasibility studies were undertaken prior to works commencing on site which included calculating payback. Our Certified Measurement and Verification Professionals (CMVP) considered all impacting costs including future alterations to FiT tariffs to increase accuracy in prediction of payback and energy savings.

Added Value / Achievements

Including the earlier Phases of this project, during 2016 – 2017, ALDI generated more than 17,500 MWh of electricity from a total of 86,000+ solar panels.

Solar panel project management

More than 17,500 MWh of electricity generated from a total of 86,000+ solar panels in a year

related CASE STUDIES

Midcounties Co-Operative – Solar Panel Installation Assessment

This project aimed to understand how solar PV installation will benefit the client long term. We have identified the yield and efficiency of solar PV and what the cost of repurposing a number of solar PV panels that were in storage specifically for Co-op. This developed into a compatibility study for solar panel installation across 44 sites.

Date Palm Developments – Complete Building Solutions

Date Palm Developments (DPD) approached ETS to design, install, and commission a new Building Management System (BMS) for their proposed "Ottons Lab." Given the complex nature of the facility, which specialises in plant cloning, highly detailed designs relating to HVAC controls and operational security were necessary to maintain optimal conditions for both plant growth and occupant comfort in the office areas.

BNP Paribas – Simulated Power Failure

The power test was successful with back-up power supplies, fire alarms, emergency lighting, pedestrian access systems all operating as expected during power failure. All equipment operated correctly and efficiently when power was reinstated.